Objective
To return both turbines to full operational service prior to winter by identifying and repairing critical blade damage, ensuring safe and reliable generation during the high-wind season.
Project:
Location:
Date:
Dunlaw Wind Farm
Scotland, UK
September–October 2025.
Challenges
No significant challenges were encountered. The project was executed smoothly, on schedule, and to planned methodology.
Value to Client
- Delivered efficient and professional LE restoration, ensuring durability through winter conditions.
- Prevented further structural deterioration, protecting asset uptime and productivity.
- Delivered the work before seasonal weather impact, ensuring turbines were reinstated swiftly and safely.