Engineering, Procurement, and Construction (EPC) delivery of a toilet module for a platform. The project involved extensive fabrication, piping, and integration works, with a focus on efficient offshore installation and minimal disruption to operations.The objective was To design, fabricate, and deliver a fully integrated toilet module, ensuring seamless tie-in to existing platform systems while avoiding operational shutdowns.

blue alert sign

Challenges

  • Complex integration with multiple live platform systems.
  • Requirement to complete tie-ins without causing platform shutdown.
  • Coordination of multiple disciplines within tight timelines.
blue tick

Solution

  • Delivered full EPC scope including fabrication and system integration.
  • Completed 275m of piping, GRP & cabling with detailed design and isometrics.
  • Executed 6 system tie-ins (potable water, wastewater, drains, PA/GA, instrument air & power) prior to HSE improvements node date.
open hand facing upwards

Value to Client

The project was delivered with an exceptional safety and performance record, completing 1,176 onshore manhours without a Lost Time Incident (LTI). The module was handed over ahead of the HSE improvement deadline, eliminating the need for a costly platform shutdown and ensuring continued operations. High-quality delivery, combined with strong collaboration throughout, reinforced client confidence and demonstrated Aurora’s ability to execute critical scopes safely, efficiently, and to a high standard.

Download the Case Study

Learn more about Integrated ServicesReturn to all case studies
Aurora logo - a helix floating above the words Aurora Energy Service

Global Experts. Proven Results. Reach Out Today.

Looking to optimise your energy assets? Our experts are here to help.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.