Engineering, Procurement, and Construction (EPC) delivery of a toilet module for a platform. The project involved extensive fabrication, piping, and integration works, with a focus on efficient offshore installation and minimal disruption to operations.The objective was To design, fabricate, and deliver a fully integrated toilet module, ensuring seamless tie-in to existing platform systems while avoiding operational shutdowns.



The project was delivered with an exceptional safety and performance record, completing 1,176 onshore manhours without a Lost Time Incident (LTI). The module was handed over ahead of the HSE improvement deadline, eliminating the need for a costly platform shutdown and ensuring continued operations. High-quality delivery, combined with strong collaboration throughout, reinforced client confidence and demonstrated Aurora’s ability to execute critical scopes safely, efficiently, and to a high standard.