Toilet Module

Icon of an arrow hitting the center of a target with concentric circles.

Objective

Engineering, Procurement, and Construction (EPC) delivery of a toilet module for a platform. The project involved extensive fabrication, piping, and integration works, with a focus on efficient offshore installation and minimal disruption to operations.The objective was To design, fabricate, and deliver a fully integrated toilet module, ensuring seamless tie-in to existing platform systems while avoiding operational shutdowns.

blue alert sign

Challenges

  • Complex integration with multiple live platform systems.
  • Requirement to complete tie-ins without causing platform shutdown.
  • Coordination of multiple disciplines within tight timelines.
blue tick

Solution

  • Delivered full EPC scope including fabrication and system integration.
  • Completed 275m of piping, GRP & cabling with detailed design and isometrics.
  • Executed 6 system tie-ins (potable water, wastewater, drains, PA/GA, instrument air & power) prior to HSE improvements node date.
open hand facing upwards

Value to Client

The project was delivered with an exceptional safety and performance record, completing 1,176 onshore manhours without a Lost Time Incident (LTI). The module was handed over ahead of the HSE improvement deadline, eliminating the need for a costly platform shutdown and ensuring continued operations. High-quality delivery, combined with strong collaboration throughout, reinforced client confidence and demonstrated Aurora’s ability to execute critical scopes safely, efficiently, and to a high standard.

Download the Case Study

Learn more about Integrated ServicesReturn to all case studies
Aurora logo - a helix floating above the words Aurora Energy Service

Especialistas Globais. Resultados Comprovados. Contacte-nos Hoje.

Procura otimizar os seus ativos energéticos? Os nossos especialistas estão aqui para ajudar.

Obrigado! A sua submissão foi recebida!
Ops! Algo correu mal ao enviar o formulário.