Objective

In astrategic move to expand its U.S. service portfolio, Aurora Energy Services acquired a used but well-maintained Liftra LT1200-2 Self-Hoisting Crane from a U.S.-based operator. This acquisition positioned Aurora to offer Liftra-based Major Component Exchange (MCE) services—a high-demand, niche segment in wind turbine maintenance.

 

The purchase not only accelerated Aurora's entry into this market but also set the foundation for a self-sufficient service model unlike any other in the industry.

Project:
Location:
Date:
N/A
Americas
May 2025

Challenges

The project faced several common challenges typically associated with major component replacements. Large lifts often cause significant disruptions, including the need for heavy crane mobilisation, delays due to weather conditions, high operational costs, and difficulties accessing remote sites. However, the use of Liftra technology helped overcome these challenges by providing a precise lifting solution with a minimal site footprint, reducing disruption and improving project efficiency.

Value to Client

The project provided significant value to the client by reducing operational disruptions and enhancing overall safety during major component exchanges. This approach offers a smarter and more sustainable way to manage turbine assets, ensuring minimal downtime and improved operational efficiency. The Liftra solution is reliable, responsive, and ready to help lift the client's performance, both in the short term and long term.

blue tick

Solution

The solution delivered was the use of Liftra Self Hoisting Crane, which enables major component exchanges, such as generators and gearboxes, without the need for traditional heavy-lift cranes.

1

This innovative approach offers several key benefits:

  • It allows for faster mobilisation, enabling repairs to begin more quickly
  • Downtime is significantly reduced, ensuring turbines return to operation sooner.
  • The overall project cost is lowered by eliminating the need for large crane operations.
2
3

Additionally, the Liftra system operates effectively within tight weather windows and is particularly well-suited for remote locations or sites with limited space.

Back to Case Studies

Click below to return to the case studies page
Case Studies Library

Global Experts. Proven Results. Reach Out Today.

Looking to optimise your energy assets? Our experts are here to help.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.