Objective
Aurora successfully delivered the fabrication and delivery of four 30-metre water injection pipeline sleepers for a North Sea Development, led by a renown subsea firm and an established O&G operator. The project scope included full fabrication, NDT, coatings, and markings to supplied drawings, followed by complex logistics and transportation to Lerwick. Final assembly was completed quayside ahead of offshore installation. The project was delivered on time, on schedule, and with zero incidents or quality issues.
Project:
Location:
Date:
N/A
Lerwick, UK
N/A
Challenges
The project required:
- Coordinating the transport of oversized structures via mixed road and ferry logistics.
- Onsite assembly within limited quayside space.
- Rapid response to last-minute design changes, requiring flexible deployment of Aurora’s team in Lerwick.
Value to Client
Aurora created significant value by:
- On-Time Delivery – All pipeline sleepers completed and delivered to contract schedule.
- Zero Incidents & Zero Quality Issues – Project executed safely and to the highest standards.
- Flexibility & Responsiveness – Aurora’s team remained on site to address design changes at short notice, ensuring no impact on schedule.
- Reliable Offshore Readiness – Fully fabricated and tested sleepers enabled seamless integration into the offshore pipeline scope.