Objective

Aurora successfully delivered a Wet Gas process piping replacement project on an offshore asset in the North Sea. The scope involved laser surveying and scanning, engineering, design, fabrication, and offshore construction. A total of 300 metres of 14” duplex steel pipework was replaced, comprising 89 spools and 23 supports. The project required a fully integrated approach to meet tight schedule demands and ensure high-precision execution in a complex offshore environment.

Project:
Location:
Date:
Wet Gas Pipework Replacement
Wet Gas Pipework Replacement
N/A

Challenges

The project was executed under a very tight schedule, requiring careful coordination across all phases to maintain timelines and quality.

Value to Client

The project delivered significant value by minimising operational disruption through efficient planning and parallel workflows. Aurora’s end-to-end approach—from laser scanning and design through to offshore construction—ensured accurate execution and reduced rework. The use of duplex steel provided enhanced corrosion resistance, supporting the long-term integrity of the asset. This smart, coordinated approach enabled successful delivery of a complex Brownfield modification within critical time constraints.

blue tick

Solution

Aurora delivered a fully integrated in-house solution that enabled

• Parallel execution of survey, design, fabrication, and offshore installation

1

• Streamlined scheduling, reducing overall project duration.

2
3

• High-precision fabrication using duplex steel to enhance system durability.

Back to Case Studies

Click below to return to the case studies page
Case Studies Library

Global Experts. Proven Results. Reach Out Today.

Looking to optimise your energy assets? Our experts are here to help.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.