Water Tower Upgrades

Icon of an arrow hitting the center of a target with concentric circles.

Objective

Aurora successfully delivered the installation and decommissioning of telecoms equipment on a Grade II listed water tower in England. The project formed part of a broader telecoms upgrade and involved specialist access, ground protection, and lifting solutions. With the site constrained by space and sensitive underground infrastructure, careful planning and innovative equipment deployment were essential to ensure a safe and effective operation. To install upgraded telecoms equipment on a listed water tower by providing safe access, low ground pressure lifting solutions, and robust ground protection — while safeguarding underground water infrastructure.

blue alert sign

Challenges

This project presented multiple site-specific challenges requiring creative solutions, including:

  • Sensitive ground conditions due to underground pipe networks beneath the water tower
  • Strict weight restrictions in close proximity to the structure
  • Limited working space, requiring compact and specialist lifting equipment
  • Need for heritage considerations due to the tower’s listed status
  • Coordinating access and lifting while maintaining safety and precision
blue tick

Solution

  • Installation of heavy-duty track mats to distribute ground pressure and protect underground water mains and infrastructure.
  • Deployment of compact lifting equipment, including spider cranes and a Bocker truck-mounted crane with man basket, to work within tight spatial constraints
  • Rigorous planning and coordination to ensure telecom riggers could access antennas safely without compromising the structural or heritage integrity of the tower
open hand facing upwards

Value to Client

Aurora’s integrated approach ensured the successful completion of the telecoms upgrade without incident or delay. By mitigating ground pressure risks and working within tight constraints, the project preserved critical water infrastructure while delivering improved network performance. The client benefited from a safe, efficient, and future-ready installation — completed on time and with minimal disruption to the surrounding area.

Learn more about Remote Access & Lifting ServicesReturn to all case studies
Aurora logo - a helix floating above the words Aurora Energy Service

Global Experts. Proven Results. Reach Out Today.

Looking to optimise your energy assets? Our experts are here to help.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.