Aurora delivered a complex recovery and restoration project following catastrophic failures on two wind turbines at a wind farm in Oklahoma. One turbine suffered a blade liberation that buckled the tower while leaving the nacelle and rotor largely intact, while a second turbine experienced a blade failure that destroyed the nacelle. Following detailed engineering assessments, Aurora safely dismantled the damaged turbine, salvaged key components, and repurposed them to restore the second turbine to service through a fully integrated turnkey solution. The aim was to safely recover and salvage reusable turbine components from a structurally compromised wind turbine and utilise them to restore a second damaged turbine, delivering a complete engineering, lifting, repair, and installation solution while managing significant structural and safety risks.



Aurora delivered a complete turnkey solution, managing every stage of the project from engineering assessment through to lifting operations, component recovery, mechanical repairs, and turbine restoration. By successfully recovering valuable components that would otherwise have been lost, the team significantly reduced replacement costs and accelerated the return of the damaged turbine to service. Despite the project's complexity and the fact that other contractors had declined the work, Aurora provided an innovative engineering solution that safely overcame the technical challenges while maintaining the highest standards of quality, safety, and execution.

Looking to optimise your energy assets? Our experts are here to help.