Mid Wales Telecom Build

Icon of an arrow hitting the center of a target with concentric circles.

Objective

To provide a turnkey lifting and logistics package for the safe and efficient construction of a telecoms tower, including planning, permits, transport, pre-assembly, and contract lift operations, in full compliance with industry safety standards such as BS7121 and LOLER.

blue alert sign

Challenges

The project required specialist planning and execution to overcome:

  • Safe transshipment of telecom tower components without damage
  • Restricted access routes and the need for route planning to avoid obstacles and rough terrain
  • Environmental factors such as weather and site ground conditions
  • Tight coordination between logistics, lifting, and installation teams to minimise downtime and handling.
blue tick

Solution

Aurora delivered a complete end-to-end service that included:

• Safe and Controlled Pre-Assembly
 – Crane-assisted assembly of frame sections at a central location to streamline final installation.

• Specialist Logistics and Transshipment – Secure transportation of large, delicate components using bespoke vehicles, padding, rigging, and weather proof protection.

Contract Lift Execution– Deployment of cranes, lift supervisors, and qualified personnel to safely place frame sections on-site, supported by detailed lift planning, risk assessments, and method statements.

open hand facing upwards

Value to Client

Aurora’s turnkey approach provided significant value by delivering a safe, compliant, and efficient end-to-end solution

  • Reduced Risk & Admin Burden – A single provider managing all logistics, lifting, and compliance ensured streamlined communication and accountability.
  • Safety & Quality Assurance – All works delivered to the highest safety standards, reducing the risk of delays, rework, or damage to critical components.
  • Enhanced Connectivity – The successful installation of the tower expanded mobile frequency coverage, improving connectivity, data speeds, and user experience for residents and businesses.
  • Future-Ready Infrastructure – The new tower supports 4G, 5G, and IoT deployment, driving digital inclusion and supporting economic growth in the community.
Learn more about Remote Access & Lifting ServicesReturn to all case studies
Aurora logo - a helix floating above the words Aurora Energy Service

Global Experts. Proven Results. Reach Out Today.

Looking to optimise your energy assets? Our experts are here to help.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.