Christmas Tree Bypass Pipework

Icon of an arrow hitting the center of a target with concentric circles.

Objective

Aurora delivered a fast-track engineering and fabrication solution for the design and manufacture of production-critical bypass pipework. The project involved the complete survey, engineering, design, procurement, and fabrication of a super duplex bypass line and contingency pipework to support the continued operation of a critical offshore asset. Working to an accelerated programme, Aurora successfully delivered the project within a three-week schedule while maintaining the highest standards of quality and safety. Our goal was to rapidly design, procure, and fabricate a production-critical bypass pipework solution that would safely restore operational capability while minimising production downtime.

blue alert sign

Challenges

  • Production-critical scope requiring immediate engineering response and accelerated delivery.
  • Compressed three-week programme covering design, procurement, and fabrication.
  • Procurement and fabrication of specialist super duplex materials within tight timescales.
  • Maintaining stringent quality assurance requirements while working to an accelerated schedule.
blue tick

Solution

Delivered a fully integrated solution including survey, engineering, design, procurement, and fabrication.

Manufactured super duplex bypass and contingency pipework to meet demanding offshore operational requirements.

Successfully executed the complete project within an accelerated three-week programme to support critical production schedules.

open hand facing upwards

Value to Client

Download the Case Study

Learn more about Integrated ServicesReturn to all case studies
Aurora logo - a helix floating above the words Aurora Energy Service

Especialistas Globais. Resultados Comprovados. Contacte-nos Hoje.

Procura otimizar os seus ativos energéticos? Os nossos especialistas estão aqui para ajudar.

Obrigado! A sua submissão foi recebida!
Ops! Algo correu mal ao enviar o formulário.