Our client identified a leak on the Cook Production XT at the connection to the flow base. As a temporary production-critical solution, Aurora was contracted to design and fabricate a bypass spool to reinstate production. The project was delivered on a fast-track schedule, with engineering and fabrication teams working around the clock to meet tight deadlines. The objective was to design, fabricate, and deliver a 6” bypass spool solution to safely restore production from the Cook field within a highly compressed timeframe.



Aurora successfully delivered the full scope within a highly compressed schedule, enabling rapid offshore installation and restoration of production by 31 December 2025. High-quality fabrication ensured zero issues during trial fit and installation, demonstrating reliability under pressure. The project highlighted Aurora’s agility and technical capability in executing fast-track, production-critical scopes, minimising downtime and protecting asset performance.


Procura otimizar os seus ativos energéticos? Os nossos especialistas estão aqui para ajudar.